Waylight · constraints
These are the constraints every board is cut against. Change one and the next cut uses it — there is no separate settings page for any of this.
North basin
Crane 2 window
Kettle point
Minimum crew rest
Relay floor
Slots per shift
Dry dock 2
Notice for project work
Cold store
Sequence lock
Changes apply to the next cut, not to boards already published. Nothing already signed is altered.